Please enable JavaScript to view this site.

pcn.cockpit® Manual

Navigation: » No topics above this level «

Important icons and colors

Scroll Prev Top Next More

Icon-Back

Back to previous screen, data will not be saved, possibly data loss

Icon-Save

Save entered data

Icon-Categorization-Unprocessed

Create a Categorization.

Icon-Categorization-Done

Show a Categorization.

Icon-Mapping

Start Mapping: no mapping has been made yet

Icon-Mapping-Wip

Show Mappings: There are mappings but more mappings has to be made

Icon-Mapping-Done

Show Mappings: mapping is complete. All parts have been mapped and no match is open

Icon-Linking

Show Linking (Parts Usage)

Icon-smartPCN

Show the contents of the smartPCN (see also Inspector)

Icon-smartPCN-orange

Show the contents of the smartPCN: smartPCN has changes which are not yet confirmed (see pcn.update)

Icon-Analysis-Add-Disabled

Creating an Analysis Workflow not (yet) possible. Button is disabled. Reason shown in tooltip.

Icon-Analysis-Add-Unprocessed

Create first Analysis Workflow. Grey: PCN does not have an analysis workflow yet.

Icon-Analysis-Add-Wip

Create an Analysis Workflow. Orange: There are already analysis workflows, but analysing does not cover all mappings or assemblies. You have to create at least one more analysis workflow.

Icon-Analysis-Add-Done

Create an optional Analysis Workflow. Green: All necessary analysis for the PCN is created, which means all mappings are covered.

Note: The color green says nothing about the state of existing analyses. It is possible that there are analysis workflows having state Open or WIP.

Icon-Analysis-Info-Disabled

Showing the Analysis Workflows not possible. Button is disabled.. Reason shown in tooltip. Most likely, no analysis workflows exist

Icon-Analysis-Info-Wip

Show the Analysis Workflow and tasks. Orange: Analysis not yet complete. There are still analysis workflows which are not done yet. You have to complete at least one analysis.

Icon-Analysis-Info-Done

Show the Analysis Workflow and tasks. Green: Existing analysis workflows are all complete (DONE).

Note: The color green says nothing about covering all mappings. It is possible, that there are missing some mappings in the analysis and thet you have to create another analysis workflow. This implies that a green analysis info button can turn back to orange.

Icon-Action-Add-Unprocessed

Create first Action Workflow. Grey: PCN does not have an action workflow yet.

Icon-Action-Add-Wip

Create an Action Workflow. Orange: There are already action workflows, but they do not cover all analysis. You have to create at least one more action workflow.

Icon-Action-Add-Done

Create an optional Action Workflow. Green: All necessary actions are created. All analysis workflows and assemblies are covered.

Note: The color green says nothing about the state of existing actions. It is possible that there are action workflows having state Open or WIP.

Icon-Action-Info-Disabled

Showing the Action Workflow not possible. Button is disabled.. Reason shown in tooltip. Most likely, no action workflows exist

Icon-Action-Info-Wip

Show the Action Workflow mit Tasks. and tasks. Orange: Action not yet complete. There are still action workflows which are not done yet. You have to complete at least one action.

Icon-Action-Info-Done

Show the Action Workflow and tasks. Green: Existing action workflows are all complete (DONE).

Note: The color green says nothing about covering all analysis and assemblies. It is possible, that there are missing some assemblies in the action and thet you have to create another action workflow. This implies that a green action info button can turn back to orange.

Icon-Followup-Unprocessed

Create first FollowUps. Grey: PCN does not have a FollowUp.

Icon-Followup-Done

Showing the FollowUps. All FollowUps are within the deadlines. You can create more FollowUps via pcn.tasks.

Icon-Followup-Wip

Showing the FollowUps. The deadline of at least one FollowUp is exceeded. You can create more FollowUps via pcn.tasks.

Icon-Badge

Badge: Number of records to be processed, such as PCN or tasks

Icon-DonePCN-Disabled

PCN cannot be completed (set to Done). Requirements not fulfilled. See Complete a PCN.

Icon-DonePCN

Complete PCN. Grey: PCN can be set to Done. All requirements are fulfilled. All necessary Analysings and Actions are created and complete or there are no Local Matches (e.g. Info PCN) or Mapping is complete and there is no analysis started.

Icon-DonePCN-green

Green: PCN is done (Done). See Complete a PCN.

Icon-Update-grey

Request PCN changes. Gray: there is a change available to the PCN in pcn.global (see pcn.update)

Icon-Update-orange

View PCN changes. Orange: Changes to PCN are ready to merge or discard (see pcn.update)

Icon-Acknowledge-orange

Confirm PCN changes you requested before. Merged changes to PCN still needs to be confirmed (see pcn.update)

Icon-History

Show change history of the PCN (see pcn update)

 

Enter data, skip process if necessary

 

Complete data, these are not complete

 

All data available, further functions callable

© by D+D+M Daten- und Dokumenationsmanagement GmbH & Co. KG