With a click on the Tasks runtime tile, you can see statistics on the runtime of PCN tasks from status Open to Done.
The information is provided at Org Unit level and is divided into monthly slices. You get monthly maximum, minimum and average values for the processing time of the tasks within the organizations.
The report data can be filtered by years and/or task types.
To do this, use the checkboxes Year(s) and Task type(s).
If you check the checkbox Combine task types?, the calculations are made across all (both) task types.
If it is unchecked, the values are calculated separately by type (Analysis/Action).
Use the button Download to export the report.